Night skyline of a dense integrated casino resort district

Macau · Asia-Pacific · Interior transformation

Cotai Floor Reconfiguration

Status: Construction · Scale: Major

A reconfiguration trading machine density for wider circulation and more table product.

Overview

Project detail

Concept

Aisle widths increase by nearly a metre and the mass floor is split into three legible neighbourhoods.

Gaming spaces

Machine count reduced by 12 per cent; 40 additional table positions.

Hospitality

A new tea lounge and two casual dining counters on the floor edge.

Technology

Electronic table banks with shared displays and updated chip tracking at premium tables.

Sustainability

Reuse of existing ceiling grid and a switch to modular carpet tiles.

Timeline

Programme

  1. 2025

    Zone one closure and strip-out

  2. 2026

    Zones two and three

  3. 2027

    Completion and re-merchandising