Macau · Asia-Pacific · Interior transformation
Cotai Floor Reconfiguration
Status: Construction · Scale: Major
A reconfiguration trading machine density for wider circulation and more table product.
Overview
Project detail
Concept
Aisle widths increase by nearly a metre and the mass floor is split into three legible neighbourhoods.
Gaming spaces
Machine count reduced by 12 per cent; 40 additional table positions.
Hospitality
A new tea lounge and two casual dining counters on the floor edge.
Technology
Electronic table banks with shared displays and updated chip tracking at premium tables.
Sustainability
Reuse of existing ceiling grid and a switch to modular carpet tiles.
Timeline
Programme
2025
Zone one closure and strip-out
2026
Zones two and three
2027
Completion and re-merchandising